Engineering divisionCloud & Platform Engineering

Modernize infrastructure
without losing control.

Assess, migrate, modernize and operate critical platforms through explicit workload decisions, controlled waves and evidence-based acceptance.

Network and server racks inside a data centre

The problem

What has to work.

Infrastructure transitions fail when a destination decision is mistaken for an executable migration plan. Workloads, dependencies, exceptions, recovery and operating ownership must move together.

Who it is for

Infrastructure and cloud leadersApplication portfolio ownersData-centre exit programmesPlatform operations teams

What ApexFlo provides

What the engagement delivers.

01

Assessment

Reconcile inventory, dependencies, constraints, ownership, target disposition and freedom of movement.

02

Migration

Execute VMware exits, NC2/NCI/AHV transitions, on-premises to public cloud and cross-cloud moves in controlled waves.

03

Modernization

Improve landing zones, platform services, observability, automation and workload operation after transition.

04

Managed platform operations

Operate agreed platform layers with runbooks, service controls, reporting and documented ownership.

What is delivered

Estate and dependency baseline
Target platform and migration factory
Cutover, validation and recovery runbooks
Modernization backlog and managed-operations model

Operating ladder

Assessment → Migration →
Modernization → Managed operations

01

Assessment

Reconcile the estate, dependencies, ownership, constraints and target disposition before committing waves.

02

Migration

Move application-consistent groups through a tested factory with standard and specialist exception lanes.

03

Modernization

Improve landing zones, platform services, observability, automation and workload operation after transition.

04

Managed operations

Operate agreed platform layers through runbooks, service controls, reporting and clear ownership.

Source-agnostic, destination-specialized

Choose the target
from the workload.

A destination-fit assessment records what can move, what should modernize, what must remain and which dependencies shape the transition.

VMware exit

Move compatible workloads to NC2/NCI/AHV or native cloud while keeping application dependencies and recovery paths explicit.

On-premises to public cloud

Establish the target foundation, replication, test launch, cutover and operational handover.

Cross-cloud migration

Rebuild the destination foundation, remap dependencies and move application groups through controlled transition.

Private and sovereign platforms

Assess isolation, data location, control-plane ownership and operational requirements before selecting a target.

Migration factory

A production system
for controlled transition.

The factory is an operating model—not a custom migration app. It combines accountable specialists, repeatable gates, established tools and programme control.

People

Platform, network, security, database, application, validation and operations specialists.

Process

Wave intake, readiness gates, cutover, acceptance, hypercare and exception management.

Tools

Configure established migration, replication, ITSM, monitoring and reporting platforms.

Control

Control tower, risk and exception backlog, evidence, metrics, decisions and escalation.

Every wave follows the same evidence path

01Discover
02Engineer
03Replicate
04Test
05Cut over
06Validate
07Hypercare

Entry evidence: dependency complete, replication healthy, runbook approved, test signed off, backup ready.

Exit evidence: business validation, data reconciliation, monitoring active, recovery verified, acceptance recorded.

Every wave exits with business validation, monitoring, recovery and acceptance evidence.

Delivery evidence

Proof from delivery.
Validation on real systems.

Completed delivery

Approximately 500 VMware workloads

Approximately 500 workloads moved to Amazon EC2 in six months through controlled replication, validation and cutover.

Current engagement

VMware to NC2 on AWS plus native EC2

An active mixed-destination migration context. Details remain bounded by the current engagement and approved evidence.

Deployment considerations

  • The practice is source-agnostic and builds specialist depth around the destination selected for each engagement.
  • Complex SAP, mainframe, database and appliance transformations begin with a dedicated specialist assessment.

Next engagement step

Begin with an assessment that produces a reconciled baseline, workload dispositions, target readiness plan, exception lanes and executable waves.

Plan an infrastructure transition